Gate Execution Engine

Input: $ARGUMENTS


Overview

Systematic execution of GOSM gates with enforcement. Current problem: Gates are YAML documents (advice), not automated checks. Rigor depends entirely on user discipline.

This procedure makes gates mandatory checkpoints that must pass before proceeding to next phase.

Steps

Step 1: Identify Gates to Execute

  1. What project/process is being gated?
  2. What phase is being completed?
  3. Which gate(s) apply at this transition?
  4. What are the gate criteria?

If no formal gates exist, derive them:

  • What MUST be true before proceeding?
  • What would make proceeding dangerous?
  • What has gone wrong at this transition in the past?

Step 2: Prepare Gate Evidence

For each gate criterion, gather:

CriterionEvidence RequiredEvidence AvailableGap
[what must be true][what would prove it][what we have][what’s missing]

Rules:

  • No self-certification (“I think it’s fine” is not evidence)
  • Evidence must be EXTERNAL to the person requesting passage
  • Absence of evidence is not evidence of absence — “no bugs found” ≠ “no bugs exist”

Step 3: Execute Gate Check

For each criterion, evaluate:

GATE CHECK:
Criterion: [statement]
Evidence: [what supports it]
Result: PASS | FAIL | CONDITIONAL | INSUFFICIENT
Confidence: high | medium | low
Notes: [any caveats]

Result definitions:

  • PASS: Evidence clearly supports the criterion
  • FAIL: Evidence contradicts the criterion
  • CONDITIONAL: Passes with specific conditions/limitations
  • INSUFFICIENT: Cannot determine — need more evidence

Step 4: Make Gate Decision

PatternDecisionAction
All PASSOPEN gateProceed to next phase
Any FAILHOLD gateFix failures, re-check
All PASS + CONDITIONALCONDITIONAL OPENProceed with conditions tracked
Any INSUFFICIENTHOLD for evidenceGather missing evidence, re-check
Mix of PASS and FAILHOLD gateFix failures, don’t proceed on partial pass

Anti-patterns to watch for:

  • “We’ll fix it in the next phase” — if the gate catches it, fix it NOW
  • “It’s close enough” — gates are binary, not gradients
  • “We don’t have time” — schedule pressure is not a gate criterion
  • “The important ones pass” — ALL criteria matter or remove the criterion

Step 5: Document Gate Record

GATE RECORD:
Project: [name]
Gate: [which gate]
Phase transition: [from] → [to]
Date: [when executed]

Results:
| # | Criterion | Result | Evidence | Notes |
|---|-----------|--------|----------|-------|
| 1 | [criterion] | PASS/FAIL | [evidence] | [notes] |

Decision: OPEN / HOLD / CONDITIONAL
Conditions (if conditional): [list]
Failures (if hold): [list with required fixes]
Next review date (if hold): [when]

Step 6: Enforce Follow-Through

If gate is HOLD:

  1. Assign each failure to someone responsible
  2. Define what “fixed” looks like (concrete, testable)
  3. Schedule re-check
  4. Do NOT allow workarounds that bypass the gate

If gate is CONDITIONAL:

  1. Track each condition as an open item
  2. Define when each condition must be resolved
  3. Define what happens if condition isn’t met by deadline

When to Use

  • At any phase transition in a project
  • Before releasing software, hardware, or deliverables
  • Before making irreversible decisions
  • When discipline is needed to prevent cutting corners
  • → INVOKE: /gaca (gate auditing) for gate quality checks
  • → INVOKE: /mcg (mention completeness gate) for specific gate types

Verification

  • All gate criteria identified
  • Evidence gathered for each criterion (not self-certification)
  • Each criterion scored PASS/FAIL/CONDITIONAL/INSUFFICIENT
  • Gate decision follows the decision table (no exceptions)
  • Failures assigned with clear fix criteria
  • Gate record documented